Under the JSC NIUIF project, crushing and delivery complexes № 1 and № 2, designed for crushing and transporting ore from +425m and +450m levels, were put into operation at the Rasvumchorr mine of KB JSC Apatit

14.12.2017

The underground crushing complex №1 consists of three crushing chambers and three conveyors. Underground ore crushing chambers are located at the +425m level, sections 11 and 8; equipped with three vibratory feeders, three mobile jaw crushers with breakers for crushing oversized rocks and other auxiliary equipment.

The underground crushing complex №2 consists of two crushing chambers and two conveyors. Underground ore crushing chambers are located at the +425m level between sections 5 and 4; equipped with two vibratory feeders, two jaw crushers with hydraulic hammers for crushing oversized rocks and other auxiliary equipment.

Each crushing chamber has an observation cabin with the crushing complex operator, which ensures the normal operation of the crushing complex. In addition, each crushing complex is equipped with an alarm system and a metal catcher.

1 (14.12.17).jpg2 (14.12.17).jpg


Back to the list